Communication Manager Maintenance-Object Repair Procedures
872 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented. By clearing error codes associated with the Digital
Looparound test, you may also clear errors generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk test verifies that this port’s NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not working
correctly, 1-way and noisy connections may be observed. This test is usually part of a port’s
long test sequence and executes in about 20 to 30 seconds.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive
Digital Looparound test
(#171)
XXND
NPE Crosstalk test (#6) X ND
Conference Circuit test (#7) X ND
Audit Update test (#36) X X ND
Table 297: Test #6 NPE Crosstalk Test
Error
Code
Test
Result
Description / Recommendation
ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1000 ABRT System resources required to run test are not available. The port may be
in use on a valid call. Use status data-module to determine when the
port is available for testing.
1. Retry the command at 1-minute intervals up to 5 times.
1001 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.