Avaya 03-300430 Home Security System User Manual


  Open as PDF
of 2574
 
Communication Manager Maintenance-Object Repair Procedures
1886 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented below. Clearing Error Codes associated with the one
test may also clear errors generated from other tests in the sequence.
Power supply recycle test (#1534)
Use the power supply recycle test to verify that the redundant power supply (slot 15) can fully
support the power load for the G650 or to shut down the power to an entire carrier to force all
the circuit boards in the carrier to recycle. This test turns off the DC output voltages for a few
seconds and then turns the voltages back on. This test is run as a scheduled test only if
redundant power supplies are present and then only on one power supply at a time. When
redundant power supplies are present, this test can generate error log entries for either power
supply.
Order of investigation Short test
Sequence
Long test
Sequence
D/ND
Power supply recycle test (#1534) D
Power supply detection test (#1535) X X ND
Power supply voltage test (#1536) X X ND
Table 688: Power supply recycle test (#1534)
Error
code
Test
result
Description and recommendation
1035 ABRT The port network is not available.
1. Use the status port-network command to verify that the network
is not up.
2. Look for alarms against EXP-PN, EXP-INT, PK-INT, etc.
3. Use diagnostic procedures for those MOs to clear the problem.
1971 ABRT The power supply is not detected.
1 of 3