Communication Manager Maintenance-Object Repair Procedures
616 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Test Synchronization Test (#417)
This test updates all the Synchronization Maintenance component circuit packs with the correct
information regarding their role in providing synchronization for the system. All the Tone-Clock,
ATM Expansion Interface, DS1 Interface, and UDS1 Interface circuit packs in the system are
updated through this test. This test either passes or aborts.
Table 204: Test #417 Test Synchronization Test
Error
Code
Test
Result
Description / Recommendation
1000 ABRT System resources required to run this test are not available.
1. Retry the command at 1-minute intervals up to 3 times.
1115 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2500 ABRT Internal system error
PASS The synchronization maintenance component circuit pack parameters
have been successfully updated. The system should be synchronized
after successful execution of this test.
1. If synchronization problems still exist, refer to the Error Log to obtain
information regarding the source of the problem.