d. Error Type 257: the NPE Crosstalk test (#1103) failed.
e. Error Type 513: the VC Summer Port Local TDM Loopback test (#1100) failed.
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented below. Clearing Error Codes associated with the one
test may also clear errors generated from other tests in the sequence.
VC-SUMPT Port NPE Crosstalk Test (#6)
This test is destructive.
The NPE controls port connectivity and gain and provides conferencing functions. The NPE
Crosstalk test verifies that this port’s NPE channel talks on the selected time slot and never
crosses over to time slots reserved for other connections. If the NPE is not working correctly,
1-way and noisy connections may be observed. This test is part of the port’s long test sequence
and takes approximately 20 to 30 seconds to complete.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
NPE Crosstalk test (#6) X Destructive
TDM Loopback test (#1100) X X Destructive
Table 898: Test #6 VC-SUMPT Port NPE Crosstalk Test
Error
Code
Test
Result
Description / Recommendation
1000
1001
ABRT System resources required to run this test are not available. The port may
be busy with a valid call.
1. Retry the command at 1-minute intervals up to 5 times.
2012 ABRT Internal system error
1. Retry the command at 1-minute intervals up to 5 times.
2100 ABRT Could not allocate the necessary resources for this test.
1. Retry the command at 1-minute intervals up to 5 times.