Communication Manager Maintenance-Object Repair Procedures
1844 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented below. Clearing Error Codes associated with the one
test may also clear errors generated from other tests in the sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external PMS device. If the
link has been disconnected already, then this test just returns “PASS.” Every resource allocated
for a PMS Link is released after this test.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
Link Tear Down test (#213) X
Destructive
Link Retry test (#215) X X
Nondestructive
Table 676: Test #213 Link Tear Down Test
Error
Code
Test
Result
Description / Recommendation
40
50
ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1010 ABRT The PMS Link has been busied out and placed in the out-of-service state.
1. Enter release pms-link to release the PMS Link from busyout
state.
2. Retry test pms-link long to execute the test.
2012 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
PASS The PMS Link is torn down.