Communication Manager Maintenance-Object Repair Procedures
2356 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order listed. By clearing Error Codes associated with the SAKI Reset test
for example, you may also clear errors generated from other tests in the sequence.
Notes:
a. See XXX-BD (Common Port Circuit Pack/Media Module)
on page 2539 for descriptions of
these tests.
b. See TONE-BD (Tone-Clock Circuit)
on page 2327 for descriptions of these tests.
c. See TDM-CLK (TDM Bus Clock)
on page 2252 for descriptions of these tests.
d. This test only runs on the standby IPSI or Tone-Clock circuit in a PN with more than one
IPSI or Tone-Clock circuit pack (high- or critical-reliability system). The circuit pack must be
a TN780 code with firmware revision 2 or above.
e. Test #149 does not run on the TN2182 or TN2312.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive
SAKI Reset test (#53) (a)XD
Clock Health test (#46) (b
)XXND
Control Channel Loop-around test (#52) (a
)XXND
Tone Generator Crosstalk test (#90) X ND
Tone Generator Transmission test (#40) X X ND
Tone Generator Audit/Update test (#41) X X ND
TDM bus Clock Circuit Status Inquiry test (#148) (c
)X XND
TDM Bus Clock Slip Inquiry test (#149) (c
)(e)XXND
TDM bus Clock PPM Inquiry test (#150) (c
)XXND
TDM bus Clock Parameter Update test (#151) (c
)X XND
Board Type Check test (#574) (c
)XXND
Standby Reference Health Check test (#651) (c
, d)XND