Communication Manager Maintenance-Object Repair Procedures
348 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented when you are inspecting errors in the system.
NO-OP Tests
The maintenance strategy for EMBEDDED AUDIX emulates the one for DIG-LINE. NO-OP
Tests apply only to DIG-LINE and not to EMBEDDED AUDIX. NO-OP tests always return PASS.
● Electronic Power Feed test (#11)
● Station Lamp Updates test (#16)
● Station (Digital) Audits test (#17)
NPE Crosstalk Test (#9)
NPE Crosstalk Test (#9) verifies that this port’s NPE channel talks on the selected time slot and
that it never crosses over to time slots reserved for other connections. An NPE that is not
working correctly may cause 1-way and noisy connections. This test is part of a port’s long test
sequence, and it executes in about 20 to 30 seconds.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive
Voice and Control Channel Local Looparound test (#13) X ND
NPE Crosstalk test (#9) X ND