Avaya 03-300430 Home Security System User Manual


  Open as PDF
of 2574
 
Communication Manager Maintenance-Object Repair Procedures
1070 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Figure 53: Far-End Internal Loop-Back Test (#797)
Table 365: Test #797 Far-End Internal Loop-Back Test
Error
Code
Test
Result
Description / Recommendation
2000 ABRT Timed out while waiting for a response from the circuit pack.
1. Retry the command at 1-minute intervals up to 3 times.
2100 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2300 ABRT The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301 ABRT The timer could not be set before sending the downlink message
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2316 ABRT Fiber link is not administered.
Use add fiber-link to administer the DS1 converter.
2321 ABRT DS1 facility is not busied out.
Use busyout ds1-facility to busyout the DS1 facility.
If there is only one DS1 facility, use busyout board to busyout the
DS1 converter circuit pack.
2332 ABRT For this system configuration, test is not allowed to execute at the far end
when there is only one DS1 facility available.
1. Execute the test at the other end of the DS1 converter complex.
1 of 2
DS1 Facility
DS1CONV
A
. . .
.
.
.
.
.
.
.
.
.
.
.
. . .
Loop at internal interfac
e
for the DS1 facility
DS1CONV
B
CSU
B
Test starts here
CSU
A