Communication Manager Maintenance-Object Repair Procedures
1922 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Station Status and Translation Audits and
Updates Test (#36)
This test updates the analog port’s message lamp state (if it has one) and translations with
information in the software.
2100 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL The port's battery feed chip is unable to supply sufficient power to the
terminal equipment. This could be a marginal test, and the terminal
equipment may be operating satisfactorily.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to fail, determine whether the customer is
experiencing problems on this line. Replace the circuit pack only if the
customer is experiencing problems.
PASS The port’s battery feed chip can provide power to the station equipment to
detect on-/off-hook, but may not be able to supply power for touch tones. If
touch tones are inoperative on this station, then replace the circuit pack
because this port is inoperative.
User-reported troubles on this port should be investigated by using other port
tests, by examining station wiring, or by examining the station.
Table 705: Test #35 Battery Feed Test (continued)
Error
Code
Test
Result
Description / Recommendation
3 of 3
Table 706: Test #36 Station Status and Translation Audits and Updates
Error
Code
Test
Result
Description / Recommendation
ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1004 ABRT The port was seized by a valid call during the test, and the test was
aborted. Use display port location to determine the station
extension. Use status station to determine the service state of the
port. If the port is in use, wait until port is idle.
1. Retry the command at 1-minute intervals up to 5 times.
1 of 2