Communication Manager Maintenance-Object Repair Procedures
1074 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Figure 54: Loopback Points for Test #799
Table 367: Test #799 Near-End External Loop-Back Test
Error
Code
Test
Result
Description / Recommendation
2100 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2000 ABRT Timed out while waiting for a response from the circuit pack.
1. Retry the command at 1-minute intervals up to 3 times.
2300 ABRT The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301 ABRT The timer could not be set before sending the downlink message
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2316 ABRT Fiber link is not administered.
● Use add fiber-link to administer the DS1 converter fiber link.
2321 ABRT DS1 facility is not busied out.
● Busyout the DS1 facility via busyout ds1-facility.
● If there is only one DS1 facility, busyout the DS1 converter circuit
pack via busyout board.
2332 ABRT With this system configuration, test is not allowed to execute at the far end
when there is only one DS1 facility available. Check the green LED at the
face plate of the DS1 converter circuit pack. The green LED should be on if
the loop is complete.
1 of 2
LB 2
LB 1
DS1 Facility
DS1CONV
A
CSU A
Test starts here
CSU B
DS1CONV
B