Communication Manager Maintenance-Object Repair Procedures
2462 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
2000 ABRT Response to the test was not received within the allowable time period.
This may be due to hyperactivity. Error Type 1538 in the error log
indicates hyperactivity. The hyperactive circuit pack is out of service, and
one or more of the following symptoms may be exhibited.
1. The UDS1-BD tests (such as Tests #138 and #139) are aborting with
Error Code 2000.
2. The tests run on the ports of this circuit pack are returning a no-board
result.
3. A busyout or a release command has no effect on the test results.
4. A list config shows that the circuit pack and its ports are properly
installed.
When hyperactivity occurs, the circuit pack is isolated from the system, and
all of its trunks are placed into the out-of-service state. The system will try
to restore the circuit pack within 15 minutes. When no faults are detected
for 15 minutes, the UDS1 interface circuit pack is restored to normal
operation. Every UDS1 Interface trunk is then returned to the in-service
state. Hyperactivity is often caused by the associated facility. In such a
case, faults (such as slips, misframes, or blue alarms) would be entered in
the error log. In addition, many hardware errors would be logged against
the associated trunk circuits. If the facility is OK and the error occurs again
after 15 minutes, replace the circuit pack.
2100 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
2 FAIL The test failed because it was not set up properly. The UDS1 pack could
not successfully put the far-end CSU into loop-back mode.
1. Rerun test ds1-loop location
far-csu-loopback-test-begin.
2. If the test continues to fail, the problem could be with the UDS1-BD
board, the CPE loopback jack equipment, or somewhere between.
Run test ds1-loop location
cpe-loopback-jack-test-begin to determine whether the CPE
loopback jack loop-back test is successful. If a CPE loopback jack
device is not being used, enter test ds1-loop location ds1/
csu-loopback-tests instead. If the closer loop-back test fails,
follow the maintenance strategy associated with that test.
Table 871: Test #1213 Far CSU Loop-Back Test (continued)
Error
Code
Test
Result
Description / Recommendation
3 of 4