Communication Manager Maintenance-Object Repair Procedures
2184 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Link Tear Down Test (#213)
This test is destructive.
The Link Tear Down test disconnects the existing link between the media server and the
external SYS-PRNT output device. If the link has already been disconnected, this test returns
PASS. Every resource allocated for a System Printer Link is released after this test.
Table 778: TEST #213 Link Tear Down Test
Error
Code
Test
Result
Description / Recommendation
40
50
ABRT Internal system error.
1. Retry the command at 1-minute intervals up to two times.
1010 ABRT The System Printer Link has been busied out.
1. Use release sp-link to release the System Printer Link from the
busyout state.
2. Enter test sp-link long to execute the test.
2012 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to five times.
FAIL Internal system error.
1. Retry the command at 1-minute intervals up to two times.
PASS The System Printer Link is torn down, or a short test sequence was executed
and the link was not torn down.