Communication Manager Maintenance-Object Repair Procedures
808 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Link Status Test (#601)
This nondestructive test determines the state of the call-control signaling link for Control LANs.
If the signaling link is physically connected, the test sends a test frame over the link and checks
for a response. The test passes only if both the signaling link is connected and the test frame is
successfully transmitted.
A failure may indicate a problem with:
● this circuit pack
● the packet bus
● the Packet Interface circuit pack
Table 277: Test #601 Link Status Test
Error
Code
Test
Result
Description / Recommendation
1125 ABRT RSCL link or C-LAN board not in service.
1. Release the board.
2. Repeat the test.
3. Escalate if the problem persists.
2012 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
2100 ABRT Internal system error.
1. Retry command at 1-minute intervals up to 5 times.
2. If the problem persists, escalate the problem.
2 FAIL The RSCL control link disconnected.
1. Retry command at 1-minute intervals up to 5 times.
2. If the test continues to fail, execute Packet Interface test (#598) (test
board location) to determine if the problem is due to the circuit
pack.
3. If Packet Interface test (#598) fails, see PKT-BUS (Packet Bus)
on
page 1790 for repair procedures.
4. If Packet Interface test (#598) passes, refer to Packet Control circuit
pack and packet-bus repair procedures.
1 of 2