Communication Manager Maintenance-Object Repair Procedures
2492 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented below. Clearing Error Codes associated with the one
test may also clear errors generated from other tests in the sequence.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive
Control Channel Loop-around test (#52) X X ND
Circuit Pack Restart test (#594) D
Invalid LAPD Frame Error Counter test (#597) X ND
PPE/LANBIC Receive Parity Error Counter test (#595) X ND
Receive FIFO Overflow Error Counter test (#596) X ND
Packet Interface test (#598) X X ND
Congestion Query test (#600) X X ND
Link Status test (#601) X X ND