Communication Manager Maintenance-Object Repair Procedures
464 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
2100 ABRT Could not allocate the necessary system resources to run this test.
ABRT Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL Test failed. Announcements recorded or played back while the clock circuitry
is not functioning properly sound distorted. The ANN-BD may be defective or
the Active Tone-Clock circuit pack (TONE-BD) may be marginal and is
causing this test to fail.
1. Reset the circuit pack via reset board PCSS and then run this test
again. If the test continues to fail, proceed to Step 2 or 3 as applicable.
!
WARNING:
WARNING: Replacing the circuit pack results in loss of integrated
announcements. See General notes
on page 465 near the
beginning of this Maintenance procedure.
FAIL 2. Replace the ANN-BD. Rerun the test. If the test continues to fail, replace
the Tone-Clock circuit pack.
!
WARNING:
WARNING: Replacing the TONE-BD causes a COLD 2 reset. See
Replacing the IPSI or Tone-Clock Circuit Pack
on page 2337.
Replacing the ANN-BD results in loss of integrated
announcements. See General notes
on page 465 near the
beginning of this Maintenance procedure.
3. If there are recurring alarms on this circuit pack caused by this test
failing, replace the ANN-BD even if the previous steps were successful.
PASS Announcement record/playbacks should have clear sound quality.
User-reported troubles on this circuit pack should be investigated using other
circuit packs and port tests. Refer to ANN-PT (announcement port)
on
page 465 for a description of the port tests.
Table 138: TEST #212 clock match inquiry test (continued)
Error
code
Test
result
Description/ Recommendation
2 of 2