Communication Manager Maintenance-Object Repair Procedures
1850 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Link Retry Test (#215)
This test sends a message to the journal printer management software process to make a data
call to the extension where the printer device connects to. If the journal printer link is already up,
this test passes without making any data call.
FAIL Internal System error.
1. Retry the command at 1-minute intervals up to 5 times.
PASS The link is torn down.
Table 679: Test #213 Link Tear Down Test (continued)
Error
Code
Test
Result
Description / Recommendation
2 of 2
Table 680: Test #215 Link Retry Test
Error
Code
Test
Result
Description / Recommendation
10 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
20 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
30 ABRT Internal system error.
1. See Procedures for Restoring the PMS Printer Link
on page 1847 for
instructions.
1010 ABRT The PMS Printer Link has been busied out to out-of-service.
1. Enter release journal wakeup-log|pms-log to release the
link from busyout state.
2. Retry test journal wakeup-log|pms-log l to execute the
test.
2012 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL The link cannot be established.
1. See Procedures for Restoring the PMS Printer Link
on page 1847 for
instructions.
PASS The link is up.