Communication Manager Maintenance-Object Repair Procedures
2318 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Tie Trunk EPF Test (#74)
The first part of this test checks for proper activation and deactivation of the port’s E lead. The
second part checks the M lead electronic power feed current flow.
S8700 | 8710:
2000
FAIL Seizure message is not received back within 10 seconds.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to fail, check the far-end PBX to ensure a
translation match at both ends.
3. Check the facility.
PASS The relevant Seizure test passes. This port is functioning properly.
1. If users are reporting troubles, examine loop connections to the
port, wiring, and stations.
0NO
BOARD
The test could not relate the internal ID to the port (no board).
1. Verify that the board’s translations are correct. Translate the
board, if necessary.
2. Enter busyout board location
3. Enter reset board location
4. Enter release board location
5. Enter test board location long
This should re-establish the linkage between the internal ID and the
port.
Table 832: Test #73,#747 Tie Trunk Seizure Test (continued)
Error
Code
Test
Result
Description / Recommendation
3 of 3
Table 833: Test #74 Tie Trunk EPF Test
Error
Code
Test
Result
Description / Recommendation
ABRT Could not allocate the necessary system resources to run the test. This
could be due to a failure to seize the port.
1. Retry the command at 1-minute intervals up to 5 times.
1 of 3