Communication Manager Maintenance-Object Repair Procedures
1888 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Power supply detection test (#1535)
The power supply detection test verifies that:
● The power supply is detected.
● No internal failures are reported.
● Input power is present.
When redundant power supplies are present, the micro controller for a power supply may still be
powered, even though input power to the power supply is not present.
PASS The power supply recycle test passes.
NO
BOARD
Power supply is administered but not detected.
1. Verify that the power supply is plugged in.
2. Replace the power supply.
Table 688: Power supply recycle test (#1534) (continued)
Error
code
Test
result
Description and recommendation
3 of 3
Table 689: Test 1535 power supply detection test
Error
code
Test
result
Description and recommendation
1000 ABRT This is an internal system error.
1035 ABRT The port network is not available.
2028 ABRT There is a problem communicating with the environmental maintenance
firmware.
2319 ABRT The EPN is out of range.
2500 ABRT An internal operation failed—Retry the command.
1 of 3