AN-LN-PT (Analog Line Port)
Issue 1 June 2005 429
System technician-demanded tests: descriptions and error codes
Investigate tests in the order presented. By clearing error codes associated with the Battery
Feed test (#35), you may clear errors generated from other tests in the sequence.
NPE Crosstalk Test (#6)
S8300 / G700: This test aborts with Error Code 1412.
This test verifies that the port’s NPE channel talks on the selected time slot and never crosses
over to time slots reserved for other connections. If the NPE is not working correctly, one-way
and noisy connections may be observed. This test is usually part of the long test sequence and
executes in about 20 to 30 seconds.
Order of Investigation Short
Test
Sequence
Long Test
Sequence
D/
ND
1
1. D = Destructive; ND = Nondestructive
Battery Feed test (#35) X X ND
Station Present test (#48) X X ND
Analog Looparound test (#161)
S8300 / G700: This test aborts with Error Code 1412.
XND
Conference test (#7)
S8300 / G700: This test aborts with Error Code 1412.
XND
NPE Crosstalk test (#6)
S8300 / G700: This test aborts with Error Code 1412.
XND
Station Status and Translation Audit and Update test
(#36)
XXND
Table 126: Test #6 NPE Crosstalk Test
Error
Code
Test
Result
Description / Recommendation
ABRT Necessary system resources could not be allocated to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to abort, escalate the problem.
1 of 4