Communication Manager Maintenance-Object Repair Procedures
1048 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Use list measurements ds1 summary to show the length of time the test ran (Test
Duration field) and number of bit errors detected (Loopback/Span Test Bit-Error
Count field).
Use release board to restore the trunks or ports on the TN767E DS1 Interface circuit pack to
the in-service state.
Table 360: Test #1216 End Loopback/Span Test
Error
Code
Test
Result
Description / Recommendation
ABRT Internal system error
1. Retry test ds1-loop location end-loopback/span-test
at 1-minute intervals up to 5 times.
1005 ABRT End Loopback/Span test cannot be executed in the current configuration.
To run this, the TN767E (or higher-suffixed) DS1 must be administered
for 24-channel operation. The Bit Rate field on the DS1 circuit pack
administration screen must be set to “1.544” for 24-channel operation.
1015 ABRT Ports on the DS1 Interface circuit pack have not been busied out to
out-of-service.
1. Enter busyout board location to put all trunks or ports of the
DS1 Interface circuit pack into the out-of-service state.
2. Retry the command.
ABRT Internal system error
2100 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1 of 3