Avaya 03-300430 Home Security System User Manual


  Open as PDF
of 2574
 
Communication Manager Maintenance-Object Repair Procedures
1718 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
The test passes if all four self-tests are successful. The test stops when any one of the self-tests
fails.
This test aborts if an ISDN test call is in progress on the Maintenance/Test digital port when the
test is requested, or if an ISDN test call is initiated while the Digital Port Sanity test is in
progress.
Table 636: Test #565 Digital Port Sanity Test
Error
Code
Test
Result
Description / Recommendation
1000 ABRT One of the Maintenance/Test digital ports is busy with background
maintenance.
1. Either wait for the port to become idle, or busyout both Maintenance/
Test digital ports on the Maintenance/Test circuit pack using busyout
port location (02) and busyout port location (03).
2. Release the ports (if they were busied out) using release port
location (02) and release port location (03).
3. Retry the command at 1-minute intervals up to 5 times.
4. If the test continues to abort, escalate the problem.
1002 ABRT The system could not allocate time slots for the test. The system may be
under heavy traffic conditions, or it may have time slots out-of-service due
to TDM-BUS errors.
1. If the system has no TDM-BUS errors, and if not handling heavy
traffic, repeat the test at 1-minute intervals up to 5 times.
2. If the test continues to abort, escalate the problem.
1004 ABRT The port was seized by a valid ISDN-PRI test call. Use list
isdn-testcall to determine which call is using the port (from the M/T
Port column). Wait for the test call to complete as indicated in the Start
Time and Duration fields, or abort the test call with clear
isdn-testcall grp#/mem#, where grp#/mem# is determined from
the B-channel field of list isdn-testcall.
1 of 3