Avaya 03-300430 Home Security System User Manual


  Open as PDF
of 2574
 
Communication Manager Maintenance-Object Repair Procedures
1504 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
Battery Holdover Hardware
Verification Test (#311)
The hardware/firmware vintage of the PN’s TN775D Maintenance boards does not support
battery holdover for all carriers. This test checks to see if PN cabinet battery holdover for all
carriers has been administered in error. If battery holdover is administered for all carriers, the
test will fail and a t alarm will be raised against this MO.
PASS The active EI circuit pack can reset the PN’s Maintenance circuit pack.
This implies the Maintenance circuit pack, the active EI circuit pack, and
active serial link are sane. There could still be a problem with the standby
EI circuit pack and standby serial link in a Duplication Option system.
Table 540: Test #306 PN Maintenance Circuit Pack Reset Test (continued)
Error
Code
Test
Result
Description / Recommendation
4 of 4
Table 541: TEST #303 PN Maintenance Circuit Pack Sanity Maze Test
Error
Code
Test
Result
Description/ Recommendation
1000 ABRT System resources required to run this test are not available.
1. Retry the command at 1-minute intervals up to 5 times.
2000 ABRT Response to the test was not received within the allowable time period.
1. Retry the command at 1-minute intervals up to 5 times.
2029 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
2500 ABRT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1 of 2