Avaya 03-300430 Home Security System User Manual


  Open as PDF
of 2574
 
ASAI-PT
Issue 1 June 2005 499
Level 1 Status Inquiry Test (#621)
This test determines the state of the transmission facility of a BRI port at the Level 1 (L1) or
physical layer. L1 can be in one of two possible states: Activated or Deactivated.
The Activated state is the correct state for an ISDN-BRI port. In this state the Level 1 interface
can communicate with the BRI endpoint or ASAI adjunct administered on this port. This test
passes if the state of L1 is activated. This test also passes if software has taken this port out of
service.
1139 ABRT The PN’s packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute test port long location and
review the results of the BRI Port Local LAN Looparound test to verify
the repair.
1141 ABRT The PKT-CTRL is out-of-service.
1. Follow the repair procedures for the PKT-CTRL.
2. Enter test port long location and review the results of the BRI
Port Local LAN Looparound test to verify the repair.
2012 ABRT Internal system error
1. Retry the command at 1-minute intervals up to 5 times.
2100 ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL The loop-around test has failed.
1. If the test fails repeatedly, attempt to reset the circuit pack if the other
ports on the board are idle. Reset the circuit pack by issuing the
busyout board location and reset board locations.
2. If the test fails again, execute test pkt P on the management
terminal. If this fails, follow the failure procedures the in PKT-BUS
section.
3. If the tests executed in step 2 pass, the problem is local to the BRI
board. Replace the circuit pack.
PASS The BRI Port Local LAN Looparound test has passed.
Table 151: Test #618 BRI Port Local LAN Looparound (continued)
Error
Code
Test
Result
Description / Recommendation
2 of 2