Communication Manager Maintenance-Object Repair Procedures
398 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
1018 ABRT The test has been disabled by administration. The default for the Test field
on the station screen is y. Determine why this field was set to n on this
station. It may be due to the brief ringing disturbance that this test may
cause.
1. To enable the test for the particular analog station being tested, enter
change station extension and set the Test field on the station
to y.
2000 ABRT Response to the test request was not received within the allowable time
period.
1. Retry the command at 1-minute intervals up to 5 times.
2100 ABRT Could not allocate necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL The terminal equipment is not connected to the circuit pack. Some
terminal equipment, such as modems, may fail even when connected
properly.
1. Remotely test the equipment.
2. If the test fails again, look for RING-GEN errors in the Error Log.
3. Check all of the wiring between the station equipment and the switch.
Then, run the test again.
4. If the test still fails, the set may be defective. Check the set, and
replace it, if necessary.
5. Some terminal equipment could fail even when it is connected
properly. If this is the case, disable the test using change station
extension (enter n into the Test field). Note that this action also
disables Tests 6, 7, 161, and 35 on this port.
PASS The station is connected properly to the switch. This test may also pass if
no terminal equipment is connected and the terminal is located very far
from the switch. Investigate user-reported troubles on this port by using
other port tests or by examining the station and its wiring.
Table 117: Test #48 Station Present Test (continued)
Error
Code
Test
Result
Description / Recommendation
2 of 3