Communication Manager Maintenance-Object Repair Procedures
2308 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
NPE Crosstalk Test (#6)
The NPE Crosstalk test verifies that a port’s NPE channel talks on the time slot assigned to it
and does not cross over to time slots reserved for other connections. If the NPE is not working
correctly, 1-way and noisy connections may be observed. The test takes 20 to 30 seconds to
complete.
Port Audit and Update test (#36) X X ND
Transmission test - ATMS (#844-848)
2
ND
1. D = Destructive, ND = Nondestructive
2. ATMS tests are not part of either sequence. They are run either on demand with test
analog-testcall, or by the ATMS schedule.
Order of Investigation Short Test
Sequence
Long Test
Sequence
D/ND
1
2 of 2
Table 829: Test #6 NPE Crosstalk Test
Error
Code
Test
Result
Description / Recommendation
ABRT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1000 ABRT System resources required to run this test are not available. The trunk
may be busy with a valid call. Use display trunk-group xx to
determine the trunk group/member number of the port. Use status
trunk to determine the service state of the port. If the service state
indicates that the port is in use, then the port is unavailable for certain
tests. Wait until the port is idle before retesting.
1. If the port status is active, but the port is idle (no connected ports),
then check the Error Log for Error Type 1025 (see Error Log table for
description of this error and required actions). The port may be
locked up.
2. If the port status is idle, then retry the command at 1-minute intervals
up to 5 times.
1001 ABRT System resources required to run this test are not available. This could
be due to a failure to seize the port.
1. Retry the command at 1-minute intervals up to 5 times.