Service function
Step Contents
Only
monitor/
operation
Power appor-
tion billing
General
equipment
monitor/operation
4 End TG-2000A, and back up the database.
5 Record the watt hour meter or meter values. *1
Turn the PLC power OFF and connect any additional wiring
for the watt hour meter, etc. Setup the additional PLC and
connect the required wiring, etc.
6
Turn the PI or DIDO controller power OFF and connect any
additional wiring for the watt hour meter, etc. Setup the
additional PI or DIDO controller, and connect the required
wiring, etc.
Start up the PLC by turning the power ON.
7
Turn the PI or DIDO controller power ON and restart.
8
Check the additional AG-150A/G-50A's version, and upgrade
if required. Register the license No. if required.
9 Start up TG-2000A, and open the initial screen.
10
Set the additional AG-150A/G-50A with "AG-150/G-50A
Connection Setting".
11
Set the additional AG-150A/G-50A or air conditioner, etc.
with "System Configuration Setting".
* Note: Never press the "Collect information from
AG-150A/G-50A" button.
Set the additional PLC and general equipment with "PLC for
General Equipment Setting".
* Note: Never execute "Initial Request" for the existing PLC.
12
Set the additional general equipment with “DIDO controller
setting”.
– –
13
Set the name of the expanded air conditioner and general
equipment with "Monitor Display Setting".
Set the additional PLC and watt hour meter (meter) with
"Meter Setting".
* Note: Never execute "Initial Request" for the existing PLC.
14
Set the additional watt hour meter (meter) with “PI controller
setting”.
15
Set each item for the additional air conditioner with "Billing
System Setting".
16
Check the set details with "Charge Setting". Set the charges
for the additional meters, etc.
17
Set the added AG-150A/G-50A or air conditioner with
"Energy Saving Setting".
– –
18
Set the time with "Time Setting".
* This can be skipped if noAG-150A/ G-50A, PLC, DIDO or
PI controller has been added.
19
Press the "End Setting" button on the initial screen and open
the Management screen.
* Send the set details to the AG-150A/G-50A, etc.
20
Monitor the current value of the watt hour meter or meter on
the "System Device" screen. Check and record the values for
the new meters. *1
21 Turn the air conditioner power ON.
22 After the air conditioner has started up, restart TG-2000A.
23
Operate all air conditioners and confirm that the operation
can be monitored.
When using the power apportion billing function, confirm that
the watt hour meter and meters correctly count up. *2
When using the general equipment functions, confirm that
the equipment can be correctly monitored and operated.
*1. Record the existing meter's value, the TG-2000A monitor value and the new meter's value.
*2. If the meter's monitor value and indicated value match before and after the test operation after completing the
settings, the values are being counted up correctly. However, if the electricity, etc., to the measuring target cannot