Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
117
8.17.2.1 Setting Procedures and Restrictions
Before setting or changing the peak cut function, check the precautions.
Preparing to set the peak cut function
[Procedure]
1) Click the [Energy Saving] button.
From the initial window, click on the [Energy Saving]
button in the System Settings group.
2) Click the [OK] button after checking the display
contents.
Check the details displayed in the warning, and then
click the [OK] button.
* If the [Cancel] button is clicked on, the settings will be
canceled and the initial window will open.
The energy saving function is set in the following
order.
Step 1 Peak cut WHM setting *1
Step 2 Peak cut setting *2
*1: It appears in case of WHM connection.
*2: Although the setting begins with Step2 when the demand control unit is connected, Step1
appears on the setting screen.
8.17.2.2 Peak cut WHM setting (Step 1)
Monitor the peak cut WHM details set in the AG-150A/G-50A.
1) Click the [Monitor] button.
If peak cut WHM is already set, the set details will
appear in the screen.
Set the peak cut WHM
In the case of using PLC
1) Select with the peak cut WHM
button.
Select the WHM used to judge the peak cut control
by clicking on
.
2) Click the [OK] button.
After setting the peak cut WHM, click on the [OK]
button. The screen will shift to the next Step.
In the case of using PI controller
1) Select with the peak cut WHM
button.
Select the WHM used to judge the peak cut control
by clicking on
.
2) Click the [OK] button.
After setting the peak cut WHM, click on the [OK]
button. The screen will shift to the next Step.
Peak cut setting preparation screen
Peak cut WHM setting screen
(In the case of using PLC)
Peak cut WHM setting screen
(In the case of using PI Controller)
Note:
The one of Air conditioner/Electricity1/Electricity2
can be set to the peak cut WHM.
During peak cut control (for watt hour mete
r
connected with PI controller), the AG-150A/G-50
A
monitors only one watt hour meter. Up to 3
AG-150A/G-50As can be connected with the
initial AG-150A/G-50A when monitoring the wat
t
hour meter with other AG-150A/G-50A s(*1).
(*1) Controlled based on the peak cut control level
of one previous minute