179
[Check sheet for apportioning result and watt hour meter]
Item Electric amount[kWh] Result MEMO
Total of apportioning electric amount total
Block total of apportioning result
[Check sheet for block chargning]
Check results
Block name
Total charge
Charge
Basic
charge
MEMO
[Check sheet for setting contents check after test run]
Item Contents Check MEMO
1 Division mode setting(Outdoor unit)
2 Division mode setting(Indoor unit)
3 Charge setting(Weekly)
4 Charge setting(Annual)
5 Charge setting(Seasonal)
6 Unit price (Normal)
7 Unit price (Seasonal)
8 Settlement day setting
9 Basic(standard) charge
10 Copy the database -
◆Note◆
・
Confirm the chargning calculation result of the first day after the test run, and check that the settings ar
e
correct.
・ When the system is changed, be sure to check the calculation result in 10 days from the changed da
y
or the next day, or on the next calculation day.
・ Be sure to keep the charging test run check sheet (including the document on the setting chang
e
created by the user) since the check sheet or the database will be the important evidence when
a
trouble occurs.