Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
182
Start button
Charging test operation
start button.
11.3.4 Charging test run operation methods
In the previous charging test operation methods, a short method was carried out for a minimum of
three days or by changing the time.
The function for simulating the charging test operation for a set
time is explained below.
With this charging test operation function, the air conditioning charges are calculated from a random start
time to a random end time on a single day. The results are then displayed.
1) Click the [Test run for energy monitoring] button in the
Maintenance group on the initial screen.
2) Click the [Start] button.
Check the various charge settings and watt hour meter
(meter) display values, and then press the [Start]
button on the Charging test operation
screen.
Charging test operation screen
3) A confirmation message appears. Click [Yes].
When the [Yes] button is selected, each data item from
the charging test operation will be collected.
4) A message appears when the start process ends.
Click the [OK] button.
A completion message appears when collection of the
various data at the billing data start point is completed.
5) Run the air-conditioner in this state for two hours.
Run the air conditioner for approx. two hours.
(If possible, set the air conditioner mode to "Test Run"
on the AG-150A/G-50A side.)
6) After two hours, click the [END] button.
Note:
With this function, the charges are calculated with the charge setting, time zone setting and
basic charge settings.
Use the test operation check sheet shown in section 11.3.
11:1
5
13:1
5
07/1
5
07/1
5
Start
End
Billing test operation period
End button
Charging test operation
end button.