Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
10
2.4 Other Devices
Other devices specified or recommended for use with the TG-2000A are listed below.
Name Manufacturer Model Notes
HUB (None specified) (None specified) 10BASE-T must be usable.
Printer (None specified) (None specified) Supports a page printer only
(Must run under the OS used
(Windows Vista/XP/2000).)
Watt hour meter
(RS-485)
1 Northern Design
(Electronics) Ltd.
2 Elcomponent
Limited
3 CIRCUTOR
4 Elcontrol energy
1 POWER RAIL 323 +
OPTION Module
2 AEM31D/485
3 CVM-BC-ITF-RS485-
C2
4 ED39din 485
Only supports RS-485 output of
the specified model and
manufacturer
RS-232C/
RS-485
converter
(None specified) (None specified) Necessary when measuring the
electric power.
Ex) B&B Electronics Model
485DRJ
Black Box Model IC520A-F or
IC108A
* Regarding watt hour meter 2,
the converter from the manu-
facturer may also emit light.
PLC
* For electric
amount pulse
count
* For PLC for
general
equipment
software
(Ver. 1 Series)
Mitsubishi Electric CPU module : Q02CPU
Base module : Q33B
Power supply module:
Q61P-A1
or Q61P-A2
Input module : QX40
Output module:
QY40P
Ethernet module:
QJ71E71-100
These are used for the power
apportion billing (electric amount
pulse count) or general equipment
operation/monitor function.
Dedicated PLC software (PAC-
YG11CDA, etc.) is required for
each function.
* The output unit is not required
for the electric amount pulse
count PLC.
PLC
* For PLC for
general
equipment
software
(Ver. 2 Series)
* For PLC for
demand input
software
(Ver.2 Series)
Mitsubishi Electric CPU module : Q02HCPU
Base module : Q33B
(Q35B, Q38B, Q312B)
Power supply module:
Q61P-A1/A2
Input module : QX40
Output module: QY40P
Ethernet module:
QJ71E71-100
Use for the general equipment's
operation/monitor function,
schedule or operation/monitor
function of general equipment
connected to IC I/O signal,
interlocking control of
air-conditioners and general
equipment.
Dedicated PLC software (PAC-
YG21CDA) is required. *1
Also used with peak cut function
connecting the demand controller.
Dedicated PLC for demand input
software (PAC- YG41CDA) is
required. *1
Watt hour meter
(for PLC or
PI controller)
(None specified) (None specified) WHM corresponding to 0.1 sec.
or longer pulse output
(semiconductor relay)
* 1kWh/pulse or less is required.
(10/1/0.1 kWh/pulse)
UPS
(Uninterruptible
power supply)
(None specified) (None specified) Install when using the power
apportion billing function. (Any
type suitable for use with
computers)
*1 This version is not compatible with the demand controller compatible peak cut function.