9
(14) Expanding billing target devices
• Always stop the air conditioner, fan and power rate count PLC or PI controller,
before expanding the devices.
• The billing function and power count function will not work correctly while the devices are being
expanded.
• Always change and check the system settings with the TG-2000A after finishing the expansion work.
Always test the operation after changing and checking the system settings.
(15) Using general equipment
• There may be cases when the general equipment cannot be monitored or operated due to a
disconnection in the wiring with the general equipment or a fault in the PLC (or DIDO controller).
Mitsubishi will not be held liable in the event of any damage. A circuit should be provided for
remedial operations when a fault occurs.
• The license number does not need to be registered in the AG-150A/G-50A when using the PLC
for general equipment software Version 1 Series.
(16) Function description
• The function/specifications may partially change and improvements may be made without any
notice.
(17) TG-2000A License
* Refer to the end of "Safety Precautions" in Chapter 1.