183
7) A message appears when the end process ends. Click
the [YES] button.
8) The test run results appear.
The air conditioning charges will be calculated for the
interval between the selection of the "Start" and
"Stop" buttons.
11.4 Energy saving and peak cut checks
About the check sheet for energy saving and peak cut setting
When setting energy saving and peak cut, use the check sheet below.
When using this sheet for peak cut check, please photocopy this and use it.
Note:
• The results for the outdoor unit's crankcase heater are calculated as one hour.
• This function only allows for a quick check. Check the calculation results a few days
later and after the first settlement date to ensure that the calculation is done correctly.
Apportioning
results per block
Shows the billing
apportion results in
block units.
A
pportioning results per mete
r
Shows the charge results in meter
units.
Unit price
Shows the charge unit
used for the air conditioner
calculation.
Crankcase heater calculation results
Shows the total of the crankcase heaters or the
one-hour power rate.
Output button
Outputs (print or CSV file)
the charging test operation
results.
EXIT button
Closes this Charging
test operation screen.
Meter select button
The meter type can be
selected.