7) Settlement-of-accounts term setting
Set the settlement-of-accounts term (start day and
end day) at the remedial apportioning setting screen.
The initial value is the settlement-of-accounts term of
the previous month.
8) Total air-conditioning charge setting
Set the total air-conditioning charge for the settlement-
of-accounts term.
9) Include/Not include standard charge setting
When the settlement-of-accounts term is one month, [Include] or [Not include] standard charge can
be selected. Set whether or not the standard charge is to be included.
10) Remedial interval setting
Set the remedial apportioning interval. The remedial start day is the settlement-of-accounts start
day and the remedial end day is the settlement-of-accounts end day.
11) Watt hour meter integrated value setting
Set the watt hour meter integrated value of each watt
hour meter from the air-conditioning charge result
(watt hour meter) for the month before last. The watt
hour meter calculated result for the month before last
is the watt hour meter integrated value for the last
day. Use that value.
The watt hour meter integrated value for all the watt hour meters must be corrected and input.
When the integrated value data changes, the display turns blue. The initial value before correction
and input is a blank display.
When setting of the remedial apportioning screen is complete, perform section 9.5.1 “(3)
Calculate remedial apportioning”.
Note:
When the settlement-of-accounts term is one
month and includes a standard charge, set the
total air-conditioning charge including this
standard charge.
When there is one power charge (no time
setting), the total air-conditioning charge does
not have to be set. This item appears in gray.
Note:
• “Recovery day” is the day the system was recovered from an HDD failure and normal
o
p
eration was restarted.
Remedial apportioning setting screen
Watt hour meter air-conditioning charge result