158
11.1 Setting Check List
Follow a setting item check list according to each function you want to use.
Detail of function
Case 1 Manage groups by address
Case 2 Manage groups and blocks by name (shown by floor plan)
Case 3 Case 2 + Manage scheduling
Case 4 Case 3 + Manage air conditioner charging
Case 5 Case 4 + Manage general equipments
Check the following items for the above cases.
Setting item Case 1 Case 2 Case 3 Case 4 Case 5
User settings V V V V
Site name settings V V V V
Set number of G-50A V V V V V G-50A
connection
setting
Set G-50A IP address
V V V V V
Configure unit V V V V V
Set cooling system V V V V V
Set the Indoor unit groups V V V V V
System
configura-
tion
settings
Set indoor units and ventilation
functions
V V V V V
Setup of unit model name V V V V V
Set the number of floors and floor
name *1
V V V V V
Create floor planes *1 V V V V V
Set the floors and G-50A units V V V V V
Position and name group icons V V V V V
Monitoring
setting
Set blocks V V V V V
Time settings V V V V
Password change V V V V
Setting schedule (Year/week) V V V
Setting watt hour meter V V
Setting charge system V V
Setting charges V V
Check initial settings for charge
system setting
V V
Setting PLC for general equipment V
Setting Energy saving/Peak cut *2
Setting Auto change over
Option
Setting DIDO, AI, PI controller
*1: Includes the sub-screen.
*2: Refer to section 11.4.
11. Setting Check List
Note:
• The license No. must be registered in the AG-150A/G-50A to use the optional annual/week
schedule and power apportioning billing system.
• Carry this out when the password needs to be changed.
• Before performing a test run, check that the clocks on the AG-150A/G-50A, PLC for
measurement meter, and PLC for General Equipment are set correctly.