Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
140
(5) Back button
Returns to the remedial apportioning conditions setting screen.
(6) End button
Ends the remedial apportioning screen.
9.5.2 Remedy when computer HDD fails (no backup)
The following describes the remedy when the computer HDD failed and the charging data was lost.
1) HDD recovery
Recover the computer HDD by replacement, etc. and install the necessary Windows(OS).
2) TG-2000A installation
Install TG-2000A, database and this program.
* Refer to the setup method and install.
3) System configuration and charging system restoration
Recover the system information by resetting the
air-conditioning system configuration, charging
system, etc.
4) Run the operation amount backup monitor.
Monitor backup of the operation amount before the
recovery day. Set the interval from the preceding
month’s count end day to the day before the recovery day.
5) Wait until the day after the settlement-of-accounts day.
Continue normal operation up to the day after the settlement-of-accounts day.
6) Start remedial apportioning.
Start remedial apportioning by clicking the [Remedial apportioning] button in the initial window. This
is described with the time series example below.
Note:
Operation amount data backup monitoring for the failure day is also possible.
Since the operation amount data is the integrated value, the data for the preceding month’s
count end day must also be monitored.
Note:
The system operates normally up to the day after the settlement-of-accounts day because
remedial apportioning is performed for one month.
Note:
• Perform remedial proportioning from the day after the settle-of-accounts day. However,
except when it is different from the normal settlement-of-accounts term. Remedial
apportioning can begin two days after the recovery day. (Only when the day after the
recovery day was normally charged.)
Failure Recovery Now
Ì Õ
z
Portion for month before last
Portion for last month (remedial)
Remedial interval
Count (1 month)
Monitor interval
Start day Failure Recovery Now End day
Ì Õ z
Operation amount data monitoring screen
Preceding month’s count end day.
Day before recovery day
Current value