Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
164
(6) Change to actual settings
After completing the charging test run check, set the actual operation settings.
(7) Copy of database
After making the actual settings, copy the database (MJ-310G.***), and store it with the charging
test run check sheet.
To make the check sheets easy to read, allocate one check sheet page for each installation floor or one
AG-150A/G-50A unit.
Note:
The following items are set to test run values for the charging test run. Change these to the
actual operation values.
Weekly charge setting, annual charge setting, seasonal period setting, settlement date
setting