Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
Contents
1. Safety Precautions.............................................................. 1
2. System Requirements ........................................................ 3
2.1 Requirements (system recommendations) ................3
2.2 Compatible Units .......................................................4
2.3 Restrictions................................................................5
2.4 Other Devices..........................................................10
3. System Configuration ....................................................... 11
3.1 System Configuration Example................................ 11
3.2 Hardware Connection Diagram................................11
4. Flow of Site Adjustment....................................................12
4.1 Flow of Site Adjustment........................................... 12
4.2 Tools for Site Adjustment......................................... 13
4.3 Step 1: Test operation from central controller
AG-150A/G-50A.......................................................13
4.4 Step 2: Connecting and installing the PLC...............13
4.5 Step 3: Initial setting of integrated centralized
control software TG-2000A......................................14
4.6 Step 4: Test operation from integrated centralized
control software TG-2000A......................................15
5. Installation.........................................................................16
5.1 Pre-installation Steps...............................................16
5.1.1 Checking the AG-150A version and
the G-50A version.......................................... 16
5.1.2 Preparing for TG-2000A setup.......................18
5.2 TG-2000A Setup(TG-2000A Ver.5.5* or later).........19
5.2.1 Setup.............................................................21
5.2.2 Running TG-2000A Setup (New setup)......... 22
5.2.3 Upgrading the TG-2000A version..................24
5.2.4 TG-2000A Uninstall ........................................26
5.2.5 Adding files to the ignore list on the
anti-virus software...........................................28
5.3 TG-2000A Setup(TG-2000A Ver.5.1*).....................29
5.3.1 Setup.............................................................29
5.3.2 Running TG-2000A Setup (New setup)......... 30
5.3.3 Upgrading the TG-2000A version..................33
5.3.4 TG-2000A Uninstall ........................................35
5.3.5 Adding files to the ignore list on the
anti-virus software...........................................36
6. Part Names and Functions ...............................................37
6.1 Window Elements....................................................37
6.2 Basic Mouse Operation ...........................................38
6.3 Accessing Functions and Moving between
Windows.................................................................. 38
7. Initial Startup and Shutdown.............................................46
7.1 Before startup.......................................................... 46
7.2 Startup.....................................................................46
7.3 Shutdown.................................................................47
8. System Setting Procedure................................................48
8.1 System Setting Screen ............................................48
8.2 System Setting Procedure....................................... 49
8.3 User Set-up..............................................................50
8.3.1 General Operation.........................................51
8.3.2 Reliability Function ........................................ 52
8.3.3 Connection Setting ........................................53
8.3.4 Energy Saving/Peak Cut and IC I/O
Signal/Interlocked Control Setting ................. 54
8.3.5 Energy Monitoring Related............................ 54
8.3.6 Transmission of Automatic Output File
by email.......................................................... 57
8.3.7 Setting the Warning Sound............................. 58
8.3.8 Trend Setting ..............................................................59
8.4 Site Name Set-up .................................................... 61
8.5 Password Set-up .....................................................61
8.6 AG-150A/G-50A Connection Set-up ........................62
8.6.1 Setting Procedure and Restrictions ...............62
8.6.2 Number of AG-150A/G-50A
set-up (Step 1)...............................................62
8.6.3 IP address of AG-150A/G-50A
set-up (Step 2)...............................................62
8.7 System Configuration Set-up....................................63
8.7.1 Setting Procedure and Restrictions......................63
8.7.2 AG-150A/G-50A data collection (Step 1).........63
8.7.3 Unit composition set-up (Step 2).....................64
8.7.4 Set-up of refrigerant system (Step 3)...............68
8.7.5 Set-up of group (Step 4) ................................69
8.7.6 Interlocked setting (Step 5) .........................................71
8.8 Set-up DIDO, AI and PI controller.................................72
8.8.1 Setting Procedure and Restrictions ...............72
8.8.2 DIDO controller (general equipment)
set-up (Step 1) ...............................................72
8.8.3 AI controller Set-up(Step 2) ...........................73
8.8.4 PI controller (Meter) Set-up(Step 3)...............74
8.9 PLC for general equipment set-up ...........................75
8.9.1 Setting Procedure and Restrictions ...............75
8.9.2 Number of PLC unit set-up (Step 1)...............75
8.9.3 PLC set-up and initial setting (Step 2)............76
8.9.4 Function setting (Step 3)................................77
8.9.5 Advanced setting (air conditioner status
monitor setting) (Step 4) ................................77
8.9.6 Advanced setting (Peak cut function
setting) (Step 5) .............................................77
8.9.7 General equipment setting (Step 6)...............78
8.10 IC I/O Signal Set-up .................................................80
8.10.1 Setting Procedure and Restrictions ...............80
8.10.2 General Equipment Set-up (Step 1)...............81
8.11 Monitoring Screen Set-up ........................................83
8.11.1 Configuration Procedure and Restrictions .....83
8.11.2 Set-up of model name (Step 1)......................83
8.11.3 Set-up of the number of floors, and
floor name (for sub screen) (Step 2) ..............84
8.11.4 Creation of a sub screen plane view
(Step 3)..........................................................85
8.11.5 Set-up of the number of floors, and
floor name (Step 4)........................................86
8.11.6 Creation of a plan view (Step 5).....................86
8.11.7 Set-up relating a sub screen plan view
and a plan view (Step 6)................................87
8.11.8 Set-up of floor name
and AG-150A/G-50A (Step 7)........................87
8.11.9 Set-up of icon arrange and name (Step 8).....88
8.11.10 Set-up of block (Step 9) .................................90
8.12 Watt Hour Meter Set-up (ForRS-485) ......................92
8.12.1 Setting Procedure and Restrictions ...............92
8.12.2 Watt Hour Meter Setting (Step1)....................92
8.12.3 Set-up for the Name and the Maximum
Integrated Value of WHM (Step 2).............................93
8.13 Measurement Meter Set-up (For PLC) ...................93
8.13.1 Setting Procedure and Restrictions ...............94
8.13.2 The number of PLC(s) (Step 1)......................94
8.13.3 PLC set-up and initial set-up (Step 2)............94
8.13.4 Measurement meter set-up (Step 3)..............95
8.14 Energy Monitoring Set-up ........................................96
8.14.1 Setting Procedure and Restrictions ...............96
8.14.2 Division mode (Step 1)...................................97
8.14.3 Relation between outdoor Unit
and watt hour Meter (Step 2).........................98
8.14.4 Electrical specification of outdoor units
(Step 3)..........................................................99
8.14.5 Relation between indoor units
and watt hour meters (Step 4) .....................100
8.14.6 Electrical specification of indoor units
(Step 5)........................................................101
8.14.7 Charge Blocks (Step 6)................................101