3. Check the charging test run results
Check the details explained in section 11.3.
4. Ending the test run
1) Correct the date and time to the current values
After the test run, reset the date and time to the current values. If the test run is carried out using this
shortened test run procedure, the date will be the current date, so only the time needs to be corrected.
2) Change the charging test run settings to the actual operation settings.
Change the charging test run settings, such as the charge settings, to the actual operation settings.