Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
Mitsubishi Electric Air Conditioning Network System
Integrated centralized control software TG-2000A
Operation Manual (Site adjustment)
Please read this manual before using the unit.
Please keep this manual for future use.
WT03901X14
2008 - Oct. (Ver. 5.1*/5.5*)
Contents
1. Safety Precautions............................................. 1
2. System Requirements ....................................... 3
3. System Configuration ........................................ 11
4. Flow of Site Adjustment..................................... 12
5. Installation.......................................................... 16
6. Part Names and Functions ................................ 37
7. Initial Startup and Shutdown.............................. 46
8. System Setting Procedure................................. 48
8.1 System Setting Screen ............................. 48
8.2 System Setting Procedure........................ 49
8.3 User Set-up............................................... 50
8.4 Site Name Set-up ..................................... 61
8.5 Password Set-up .......................................61
8.6 AG-150A/G-50A Connection Set-up......... 62
8.7 System Configuration Set-up.................... 63
8.8 Set-up DIDO, AI and PI controller.................. 71
8.9 PLC for general equipment set-up............ 75
8.10 IC I/O Signal Set-up.................................. 80
8.11 Monitoring Screen Set-up......................... 83
8.12 Watt Hour Meter Set-Up (For RS-485) ..... 92
8.13 Measurement Meter Set-up (For PLC) ..... 93
8.14 Energy Monitoring Set-up ......................... 96
8.15 Charge Set-up (For RS-485)....................103
8.16 Charge Set-up (For PLC, PI controller
and without WHM connection).................105
8.17 Energy Saving/peak Cut Set-up...............112
8.18 Night Mode Set-up...................................120
8.19 Auto Change Over Set-up .......................121
8.20 Time Set-up.............................................124
8.21 Monitoring and Changing the Meter
Present Value.......................................... 126
9. Charge Data Correction and Remedy................127
9.1 Result of Air-conditioning Charge
Calculation................................................127
9.2 Maintenance of Charge Data....................129
9.3 Operation Amount Data Monitoring ..........134
9.4 Charge Parameter Output ........................136
9.5 Charging Remedy.....................................137
9.6 Remedial Apportioning of Charges...........148
9.7 Maintenance of Charge Comparison Data
When G-50A and WHM/Measurement
Meter Fail or Are Replaced.......................151
10. Error Code List...................................................153
11. Setting Check List ............................................158
A
ppendix 1 : Checking the Windows Service Pack
Version and Memory Size…………...194
A
ppendix 2 : Auto Log-in Confirmation Method......202
A
ppendix 3 : Correcting the Power Apportioning
Bill When AG-150A/G-50A Fails
or Is Replaced...................................204
A
ppendix 4 : Shortening the Charging Test Run....206
A
ppendix 5 : Backing Up the System Setting Data 209
A
ppendix 6 : Upgrading the Functions...................211
A
ppendix 7 : Expanding the System......................214
A
ppendix 8 : Charging Setting for A and K Control
and LOSSNAY Units......................... 217