Emerson Process Management HASX2E-IM-HS Carbon Monoxide Alarm User Manual


 
Emerson Process Management GmbH & Co. OHG 7-29
X-STREAM X2
Instruction Manual
HASX2E-IM-HS
02/2012
7
Maintenance & Procedures
7.4.3 Advanced Calibration
Gasow V4
Procedure Zeroing
Time 29 s
When the prepurge time has elapsed, the
instrument starts to calculate the zero point
(here indicated by the procedure term Zero-
ing) for all channels with the same zero gas
valve assigned: Zero gas is still applied, the
time count down starts at 40 s.
Note!
Multi channel instruments zeroing more than
1 channel at a time, show Zeroing in the
procedure line while calibration is ongoing. To
see which channels are currently calibrated,
see the status line in the measuring screen.
The rst screen appearing shows that valve
V4 is open. Currently the system is purged
(prepurge) to ensure it is properly lled with
span gas when span calculation is started.
Here the remaining purge time is 10 seconds
(decreasing from the value entered in the
calibration setup screen,
page 7-14).
Gasow V4
Procedure Purging
Time 10 s
Now the instrument is checked for additional
channels not yet zero calibrated and if there
are any, the procedure begins again with the
rst step as described at the top of this page,
now with another valve (zero gas).
Once all channels are zero calibrated, auto-
matically a span calibrate all channels proce-
dure is started:
This procedure is just a combination of the
two described before: At the beginning all
channels are zeroed and then all channels are
spanned: Watch the screen for status infor-
mation (in the following explained by means
of exemplary gures; valve designators for
example only).