15 - 95
15. SERVO AMPLIFIERS WITH A LARGE CAPACITY
(
30k TO 55kW
)
2) When connecting two brake units to a converter unit
POINT
To use brake units with a parallel connection, use two sets of FR-BU2-(H) brake
unit. Combination with other brake unit results in alarm occurrence or
malfunction.
Make sure to connect the master and slave terminals (MSG and SD) of the two
brake units.
Do not connect the converter unit and brake units as below. Connect the cables
with a terminal block to distribute as indicated in this section.
N/
P/
Brake unit
Brake unit
Converter unit
L
L
N/
P/
Connecting two cables to
P and N terminals
N/
P/
Brake unit
Brake unit
Converter unit
L
L
N/
P/
Passing wiring