6 - 25
6 MOTION SFC PROGRAMS
(c) The following patterns may be set.
• End (END) from "Shift Y/N" or "WAIT Y/N" • Jump from "Shift Y/N" or "WAIT Y/N"
END
P1 P2
• Continuation from "Shift Y/N" or "WAIT Y/N" to "Shift Y/N" or "WAIT Y/N"
(selective branch-selective branch)
END
• When there are two or more connection lines from Y/N side of "Shift Y/N" or "WAIT
Y/N", selective branch continues to selective branch or parallel branch.