IS-IS: Level-1 DR Elections : 2
IS-IS: Level-2 DR Elections : 2
IS-IS: Level-1 SPF Calculations : 29
IS-IS: Level-2 SPF Calculations : 29
IS-IS: LSP checksum errors received : 0
IS-IS: LSP authentication failures : 0
Dell#
You can assign more NET addresses, but the System ID portion of the NET address must remain the
same. The system supports up to six area addresses.
Some address considerations are:
• In order to be neighbors, configure Level 1 routers with at least one common area address.
• A Level 2 router becomes a neighbor with another Level 2 router regardless of the area address
configured. However, if the area addresses are different, the link between the Level 2 routers is only at
Level 2.
Configuring Multi-Topology IS-IS (MT IS-IS)
To configure multi-topology IS-IS (MT IS-IS), use the following commands.
1. Enable multi-topology IS-IS for IPv6.
ROUTER ISIS AF IPV6 mode
multi-topology [transition]
Enter the keyword transition to allow an IS-IS IPv6 user to continue to use single-topology mode
while upgrading to multi-topology mode. After every router has been configured with the
transition keyword, and all the routers are in MT IS-IS IPv6 mode, you can remove the
transition keyword on each router.
NOTE: When you do not enable transition mode, you do not have IPv6 connectivity between
routers operating in single-topology mode and routers operating in multi-topology mode.
2. Exclude this router from other router’s SPF calculations.
ROUTER ISIS AF IPV6 mode
set-overload-bit
3. Set the minimum interval between SPF calculations.
ROUTER ISIS AF IPV6 mode
spf-interval [level-l | level-2 | interval] [initial_wait_interval
[second_wait_interval]]
Use this command for IPv6 route computation only when you enable multi-topology. If using single-
topology mode, to apply to both IPv4 and IPv6 route computations, use the spf-interval
command in CONFIG ROUTER ISIS mode.
4. Implement a wide metric-style globally.
ROUTER ISIS AF IPV6 mode
isis ipv6 metric metric-value [level-1 | level-2 | level-1-2]
To configure wide or wide transition metric style, the cost can be between 0 and 16,777,215.
Intermediate System to Intermediate System
495