Omron V022-E3-1 Thermostat User Manual


 
Caution
Caution
Note

Section 2-2
3-2 Installation
Install the NT600S to the operation panel and connect the power tothe NT600S as
described below.
Select a proper location referring to Appendix D Installation Environment (page
262).
Always switch OFF the power before assembling equipment or connecting
cables. Otherwise you could sustain an electric shock or equipment could be
damaged.
3-2-1 Installation to the Operation Panel
The NT600S can be flush mounted to an operation panel.
Use the panel fittings and tools included in the product package andfollow the pro-
cedure below.
During work at the panel, take care to ensure that no metal scraps enter the unit.
Otherwise, the product may malfunction.
The thickness of applicable operation panel is 1.6 mm to 4.8 mm.
All fittings must be tightened uniformly to a torque of 0.5 to 0.6 N m in order to
ensure water- and dust- resistance. The panel must not be soiled or warped,
and must be able to support an installation that will remain secure and strong.
(1) Open a hole, shown below, in the panel and install the NT600S from the front
side of the panel.
180.5
263.5
+0.5mm
0mm
+0.5mm
0mm
(2) Attach the panel fittings at four positions for the upper/lower sides and at two
positions for the right and left sides, shown below, on the rear side of the
NT600S.
Fit the hook of the fitting in the square hole in the body and tighten the screw
with a Phillips head screwdriver while lightly pulling the fitting.