A SERVICE OF

logo

8. Getting started
Image 8-138
Start Calibration: button
Note: A good practice is to always ch eck the Force Gimbal r eset before capture or realign checkbox.
6. In the appearing ECR Calibration dialog:
-pressSelected Grou p to start the ECR calibration process to all the projectors of the selected group.
-pressSelected Projector to start the ECR calibration process to the selected projectors of the selected group.
-pressCan cel to abort the ECR calibration.
Image 8-139
ECR Calibration dialog
Messages in the feedback section indicate the progress of the ECR calibration.
106
R59770509 AUTOALIGNMENT HEAD GEN II 26/11/2013