Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53300067-01 Printed in U.S.A. Form 30RAP-2T Pg CL-1 12-10 Replaces: 30RAP-1T
START-UP CHECKLIST FOR 30RAP LIQUID CHILLER
(Remove and use for Job File)
I. Project Information
JOB NAME ______________________________________________________________________________
ADDRESS _______________________________________________________________________________
CITY ____________________________________________ STATE _______________ ZIP______________
INSTALLING CONTRACTOR ________________________________________________________________
SALES OFFICE ___________________________________________________________________________
START-UP PERFORMED BY ________________________________________________________________
Design Information
UNIT MODEL ______________________________ SERIAL ________________________________
II. Preliminary Equipment Check
IS THERE ANY PHYSICAL DAMAGE? YES NO
DESCRIPTION ____________________________________________________________________________
________________________________________________________________________________________
1. UNIT IS INSTALLED LEVEL AS PER THE INSTALLATION INSTRUCTIONS.
YES NO
2. POWER SUPPLY AGREES WITH THE UNIT NAMEPLATE.
YES NO
3. ELECTRICAL POWER WIRING IS INSTALLED PROPERLY.
YES NO
4. UNIT IS PROPERLY GROUNDED.
YES NO
5. ELECTRICAL CIRCUIT PROTECTION HAS BEEN SIZED AND INSTALLED PROPERLY.
YES NO
6. ALL TERMINALS ARE TIGHT.
YES NO
7. ALL PLUG ASSEMBLIES ARE TIGHT.
YES NO
8. ALL CABLES AND THERMISTORS HAVE BEEN INSPECTED FOR CROSSED WIRES.
YES NO
9. ALL THERMISTORS ARE FULLY INSERTED INTO WELLS.
YES NO
Chilled Water System Check
1. ALL CHILLED WATER VALVES ARE OPEN.
YES NO
2. ALL PIPING IS CONNECTED PROPERLY.
YES NO
3. ALL AIR HAS BEEN PURGED FROM THE SYSTEM.
YES NO
4. CHILLED WATER PUMP IS OPERATING WITH THE CORRECT ROTATION.
YES NO
CAPACITY CEAT EWT LWT FLUID TYPE FLOW RATE P.D.