5.2.7 Creating a program
5 - 9
1
OVERVIEW
2
CREATED PROGRAM
AND SYSTEM
CONFIGURATION
3
CREATING PROGRAM IN
STRUCTURED LADDER/
FBD LANGUAGE
4
CREATING
PROGRAM IN ST
LANGUAGE
5
CREATING TWO OR
MORE PROGRAM
BLOCKS
5.2 Creating a Project
5.2.7 Creating a program
Refer to the following section and manual for the program creation procedures:
3.2.6 Creating a program
GX Works2 Version 1 Operating Manual (Structured Project)
■ Creating the program block for the tea pouring operation
Create the program block for the tea pouring operation shown in Section 5.1.2.
1. Double-click "POU" "Program" "pouring"
"Program" on the Project view to display the
pouring [PRG] Program [Structured Ladder/
FBD] screen.
2. Create the program block for the tea pouring
operation shown in Section 5.1.2.
Refer to the following section and manual for the
program creation procedures:
3.2.6 Creating a program
GX Works2 Version 1 Operating Manual
(Structured Project)
Double-click it.
Specify global labels.