Mitsubishi Electronics SW1DNC-GXW2-E Water System User Manual


 
4.4.2 Batch monitoring of device values
4 - 11
4.5 Diagnosing the programmable controller
1
OVERVIEW
2
CREATED PROGRAM
AND SYSTEM
CONFIGURATION
3
CREATING PROGRAM IN
STRUCTURED LADDER/
FBD LANGUAGE
4
CREATING
PROGRAM IN ST
LANGUAGE
5
CREATING TWO OR
MORE PROGRAM
BLOCKS
4.5 Diagnosing the programmable controller
You can check the programmable controller RUN/STOP status and error status.
Refer to the following section for the diagnosis procedure:
3.5 Diagnosing the programmable controller
4.6 Reading a Project from programmable controller
Refer to the following section for the procedure to read a project from the programmable controller:
3.6 Reading a Project from programmable controller
4.7 Printing
For the Saving a Project procedure, refer to the following.
3.7 Printing
4.8 Saving a Project
Refer to the following section for the project saving procedure:
3.8 Saving a Project
4.9 Exiting GX Works2
Refer to the following section for the project ending procedure:
3.9 Exiting GX Works2