Mitsubishi Electronics SW1DNC-GXW2-E Water System User Manual


 
3.4.1 Monitoring a program
3 - 33
1
OVERVIEW
2
CREATED PROGRAM
AND SYSTEM
CONFIGURATION
3
CREATING PROGRAM IN
STRUCTURED LADDER/
FBD LANGUAGE
4
CREATING
PROGRAM IN ST
LANGUAGE
5
CREATING TWO OR
MORE PROGRAM
BLOCKS
3.4 Monitoring Operations
5. Turn ON inputs X0, X1 and X2 in the programmable controller, and check the following
operations.
You can turn ON inputs X0, X1 and X2 using the test operation above.
When X0 turns ON, the programmable controller turns ON Y10, and then turns OFF Y10 1
second later.
When X1 turns ON, the programmable controller transfers K10 to VAR1 (device: D0).
When X2 turns ON, the programmable controller transfers K20 to VAR1 (device: D0).
6. Select [Online] [Monitor] [Stop
Monitoring] to reset the monitor status of the
POU_01 [PRG] Program [Structured Ladder/
FBD] screen.
You can click (Stop Monitoring) to reset the
monitor status of the POU_01 [PRG] Program
[Structured Ladder/FBD] screen.
7. Set the programmable controller CPU to STOP.
Set the RUN/STOP switch on the programmable
controller CPU to "STOP".
You can switch the programmable controller status
between "RUN" and "STOP" using remote
operation.
For the remote operation, refer to the following.
"Point" in the step4
X0 turns ON. Y10 remains ON for 1 second.
X1 turns ON. The programmable controller transfers K10 to VAR1.
X2 turns ON. The programmable controller transfers K20 to VAR1.