3.3.1 Connecting the personal computer to the programmable controller
3 - 25
1
OVERVIEW
2
CREATED PROGRAM
AND SYSTEM
CONFIGURATION
3
CREATING PROGRAM IN
STRUCTURED LADDER/
FBD LANGUAGE
4
CREATING
PROGRAM IN ST
LANGUAGE
5
CREATING TWO OR
MORE PROGRAM
BLOCKS
3.3 Writing a Project to the programmable controller
● For selecting the newly created connection destination, check "Set as Default Connection " while creating
the data, or set the newly created connection destination as the default connection destination as described
below.
Then, the newly created connection destination will be selected as the connection destination for
communication with the programmable controller CPU (for "Read from PLC", "Write to PLC", etc).
1. Select "Connection2" in the All
Connections on the Connection
Destination view, right-click it, and then
select the menu item "Set as Default
Connection".
2. The connection destination set as the
default connection destination is
displayed in "Current Connection" on the
Connection Destination view.
Default Connection